150万ta焦炭焦化厂煤气预处理工段初步设计.rar
150万ta焦炭焦化厂煤气预处理工段初步设计,合格作品 字数24938摘 要 煤气的初步冷凝、输送及初步净化,是炼焦化学产品回收工艺过程的基础。本设计为年产150万吨焦炭焦化厂煤气预处理工段的初步设计,该工段主要分为煤气的初步冷却、焦油和氨水的分离和煤气的输送三部分。设计中采用了间接横管式初冷的工艺流程,选择的是负压操作,即电捕器在鼓风机前。该工艺具有效率高、占地...
该文档为压缩文件,包含的文件列表如下:
内容介绍
原文档由会员 白痴学东西 发布
合格作品 字数24938
摘 要
煤气的初步冷凝、输送及初步净化,是炼焦化学产品回收工艺过程的基础。本设计为年产150万吨焦炭焦化厂煤气预处理工段的初步设计,该工段主要分为煤气的初步冷却、焦油和氨水的分离和煤气的输送三部分。设计中采用了间接横管式初冷的工艺流程,选择的是负压操作,即电捕器在鼓风机前。该工艺具有效率高、占地省、操作简单、投资省、运行成本低等优点,已经在我国广泛使用。设计遵循“经济合理、安全环保”等原则,对工艺论证、工艺选择、工艺计算、设备设计及选型进行了论述。
关键词:煤气预处理;横笯@趵淦鳎还姆缁?br>Abstract
Initial condensation of gas, transmission and initial purification,chemical products of coking based recovery process.The design for the annual output of 150 tons of coke coke plant cold section in the preliminary design of the drum,The Section is divided into the initial cooling gas, tar and ammonia separation and gas delivery of three parts. Designed with the beginning of indirect horizontal tube cold process, the choice is negative pressure operation, that is, before the blower electric fishing devices. This technology has high efficiency, covers an area of province, simple operation, low investment, lower operating cost advantages.It has been widely used in China Design follow the "economic and reasonable, safe environmental protection" principle, to process demonstration, process calculation, equipment design and selection are reviewed in this paper.
Keywords Gas pretreatment Cross tube Primary cooling devicer Blower
目 录
摘 要 I
Abstract II
第一章 绪论 1
1.1 煤炭的应用领域 1
1.2 煤气初步冷却的目的和意义 1
第二章 工艺论证 3
2.1 煤气的直接冷却工艺 3
2.2 煤气的间接冷却工艺 4
2.3 煤气的间冷-直冷混合冷却 4
2.4 初冷器型式 5
2.4.1 横管式初冷器 5
2.4.2 立管式初冷器 6
2.5电捕焦油器 7
2.5.1电捕焦油器的工作原理 7
2.5.2 电捕焦油器的构造 8
2.6鼓风机结构及特点 9
2.6.1 离心式鼓风机 9
2.6.2 罗茨式鼓风机 9
2.7机械化氨水澄清槽结构及特点 10
第三章 工艺详述 11
3.1 工艺流程 11
3.2煤气的初步冷却 11
3.3焦油和氨水的分离 13
3.4 煤气的输送 14
3.5 煤气初冷的工艺选择 14
3.5.1氨水、焦油和焦油渣澄清分离的工艺操作 14
3.5.2煤气鼓风机的工艺操作 15
3.5.3电捕焦油器的工艺操作 16
3.6工艺选择 16
3.6.1鼓风冷凝工段工艺流程 16
第四章 工艺计算及设备选型 18
4.1 物料衡算和热量衡算 18
4.1.1 集气管物料和热量衡算 19
4.1.2 横笯@趵淦魅攘亢臀锪虾馑?26
4.2 主要设备计算 35
4.2.1 初冷器的工艺计算 35
4.2.2 集气管的工艺计算,选型 41
4.2.4 鼓风机的计算,选型 42
4.2.5 中间槽的计算,选型 43
4.2.6 电捕焦油器的计算 44
4.3设备一览表 48
第五章 对有关专业设计的要求 50
5.1土建专业 50
5.2给排水专业 50
5.3采暖通风及热力专业 50
5.4 电气专业 51
5.5检验化验项目 51
第六章 综合概算和经济分析 53
6.1投资费用 53
6.2 成本核算 55
6.3经济效益评估 57
6.4车间布置 57
结束语 58
致 谢 59
参考文献 60
Content
Abstract …………………………………………………………………………...I
Abstract…………………………………………………………………………....II Chapter 1 Introduction…………………………………………………… ....1
1.1 Coal fields of application…………………………………………….... 1
1.2 Gas preliminary the cooling of the purpose and meaning …… ……. ...1
Chapter 2 Technology Demonstration…………………………………………..3
2.1 Gas directly cooling process…………………………………..…...........3
2.2The indirect cooling process gas………………………………………....4
2.3 Gas indirect cooling, direct cooling mixing process ……….………..…4
2.4Preliminary condensing cooler types………………………………..…..5
2.4.1 Horizontal pipe indirect preliminary condensing cooler….….…..5
2.4.2 The stand pipe type indirect preliminary condensing cooler …….6
2.5 Electric detarrer……………………………………………….…….….7
2.5.1 Electric detarrer principle of work…………………….……………7
2.5.2Electric detarrer structure……………………………….……..….8
2.6Blower structure characteristics …………………………….……..…...9
2.6.1 Centrifugal blower ………………………………….….……..…9
2.6.2 ROM. Watts air blower type……………………….….……..…..9
2.7The structure of the ammonia tank mechanization clarification and characteristics ………………………………………………….……....10
Chapter 3 Process detailed………………………………………….……… …11
3.1 Process technology………………………………….………………......11
3.2 Preliminary cooling gas…………………………….……………...……11
3.3 The separation of tar and ammonia……………….……………….........13
3.4 Gas delivery……………………………………………….…………….14
3.5 process operation of cold gas in early…………………….…………..…14
3.5.1 Ammonia, tar and tar residue to clarify the separation process operation……………………………….……………………....15
3.5.2 Process..
摘 要
煤气的初步冷凝、输送及初步净化,是炼焦化学产品回收工艺过程的基础。本设计为年产150万吨焦炭焦化厂煤气预处理工段的初步设计,该工段主要分为煤气的初步冷却、焦油和氨水的分离和煤气的输送三部分。设计中采用了间接横管式初冷的工艺流程,选择的是负压操作,即电捕器在鼓风机前。该工艺具有效率高、占地省、操作简单、投资省、运行成本低等优点,已经在我国广泛使用。设计遵循“经济合理、安全环保”等原则,对工艺论证、工艺选择、工艺计算、设备设计及选型进行了论述。
关键词:煤气预处理;横笯@趵淦鳎还姆缁?br>Abstract
Initial condensation of gas, transmission and initial purification,chemical products of coking based recovery process.The design for the annual output of 150 tons of coke coke plant cold section in the preliminary design of the drum,The Section is divided into the initial cooling gas, tar and ammonia separation and gas delivery of three parts. Designed with the beginning of indirect horizontal tube cold process, the choice is negative pressure operation, that is, before the blower electric fishing devices. This technology has high efficiency, covers an area of province, simple operation, low investment, lower operating cost advantages.It has been widely used in China Design follow the "economic and reasonable, safe environmental protection" principle, to process demonstration, process calculation, equipment design and selection are reviewed in this paper.
Keywords Gas pretreatment Cross tube Primary cooling devicer Blower
目 录
摘 要 I
Abstract II
第一章 绪论 1
1.1 煤炭的应用领域 1
1.2 煤气初步冷却的目的和意义 1
第二章 工艺论证 3
2.1 煤气的直接冷却工艺 3
2.2 煤气的间接冷却工艺 4
2.3 煤气的间冷-直冷混合冷却 4
2.4 初冷器型式 5
2.4.1 横管式初冷器 5
2.4.2 立管式初冷器 6
2.5电捕焦油器 7
2.5.1电捕焦油器的工作原理 7
2.5.2 电捕焦油器的构造 8
2.6鼓风机结构及特点 9
2.6.1 离心式鼓风机 9
2.6.2 罗茨式鼓风机 9
2.7机械化氨水澄清槽结构及特点 10
第三章 工艺详述 11
3.1 工艺流程 11
3.2煤气的初步冷却 11
3.3焦油和氨水的分离 13
3.4 煤气的输送 14
3.5 煤气初冷的工艺选择 14
3.5.1氨水、焦油和焦油渣澄清分离的工艺操作 14
3.5.2煤气鼓风机的工艺操作 15
3.5.3电捕焦油器的工艺操作 16
3.6工艺选择 16
3.6.1鼓风冷凝工段工艺流程 16
第四章 工艺计算及设备选型 18
4.1 物料衡算和热量衡算 18
4.1.1 集气管物料和热量衡算 19
4.1.2 横笯@趵淦魅攘亢臀锪虾馑?26
4.2 主要设备计算 35
4.2.1 初冷器的工艺计算 35
4.2.2 集气管的工艺计算,选型 41
4.2.4 鼓风机的计算,选型 42
4.2.5 中间槽的计算,选型 43
4.2.6 电捕焦油器的计算 44
4.3设备一览表 48
第五章 对有关专业设计的要求 50
5.1土建专业 50
5.2给排水专业 50
5.3采暖通风及热力专业 50
5.4 电气专业 51
5.5检验化验项目 51
第六章 综合概算和经济分析 53
6.1投资费用 53
6.2 成本核算 55
6.3经济效益评估 57
6.4车间布置 57
结束语 58
致 谢 59
参考文献 60
Content
Abstract …………………………………………………………………………...I
Abstract…………………………………………………………………………....II Chapter 1 Introduction…………………………………………………… ....1
1.1 Coal fields of application…………………………………………….... 1
1.2 Gas preliminary the cooling of the purpose and meaning …… ……. ...1
Chapter 2 Technology Demonstration…………………………………………..3
2.1 Gas directly cooling process…………………………………..…...........3
2.2The indirect cooling process gas………………………………………....4
2.3 Gas indirect cooling, direct cooling mixing process ……….………..…4
2.4Preliminary condensing cooler types………………………………..…..5
2.4.1 Horizontal pipe indirect preliminary condensing cooler….….…..5
2.4.2 The stand pipe type indirect preliminary condensing cooler …….6
2.5 Electric detarrer……………………………………………….…….….7
2.5.1 Electric detarrer principle of work…………………….……………7
2.5.2Electric detarrer structure……………………………….……..….8
2.6Blower structure characteristics …………………………….……..…...9
2.6.1 Centrifugal blower ………………………………….….……..…9
2.6.2 ROM. Watts air blower type……………………….….……..…..9
2.7The structure of the ammonia tank mechanization clarification and characteristics ………………………………………………….……....10
Chapter 3 Process detailed………………………………………….……… …11
3.1 Process technology………………………………….………………......11
3.2 Preliminary cooling gas…………………………….……………...……11
3.3 The separation of tar and ammonia……………….……………….........13
3.4 Gas delivery……………………………………………….…………….14
3.5 process operation of cold gas in early…………………….…………..…14
3.5.1 Ammonia, tar and tar residue to clarify the separation process operation……………………………….……………………....15
3.5.2 Process..