海洋平台定位系统设计.rar

RAR格式版权申诉手机打开展开

海洋平台定位系统设计,原创硕士论文摘要海洋资源极为丰富,开发海洋资源成为各国追逐的热点,直接带动了国际海洋工程装备业迅猛发展,从而出现了海上系泊自动定位系统供不应求的状况,而目前系泊自动定位系统设计制造技术一直被国外垄断,因而严重制约了我国海洋工程装备业的发展。连续两个五年规划,海洋工程装备都是我国重点发展的16项重大技...
编号:150-311406大小:11.10M
分类: 论文>通信/电子论文

该文档为压缩文件,包含的文件列表如下:

内容介绍

原文档由会员 qs_niirng 发布

º£Ñóƽ̨¶¨Î»ÏµÍ³Éè¼Æ

Ô­´´Ë¶Ê¿ÂÛÎÄ

Õª Òª
º£Ñó×ÊÔ´¼«Îª·á¸»£¬¿ª·¢º£Ñó×ÊÔ´³ÉΪ¸÷¹ú×·ÖðµÄÈȵ㣬ֱ½Ó´ø¶¯Á˹ú¼Êº£Ñ󹤳Ì×°±¸ÒµÑ¸ÃÍ·¢Õ¹£¬´Ó¶ø³öÏÖÁ˺£ÉÏϵ²´×Ô¶¯¶¨Î»ÏµÍ³¹©²»Ó¦ÇóµÄ×´¿ö£¬¶øĿǰϵ²´×Ô¶¯¶¨Î»ÏµÍ³Éè¼ÆÖÆÔì¼¼ÊõÒ»Ö±±»¹úÍ⢶ϣ¬Òò¶øÑÏÖØÖÆÔ¼ÁËÎÒ¹úº£Ñ󹤳Ì×°±¸ÒµµÄ·¢Õ¹¡£Á¬ÐøÁ½¸öÎåÄê¹æ»®£¬º£Ñ󹤳Ì×°±¸¶¼ÊÇÎÒ¹úÖص㷢չµÄ16ÏîÖØ´ó¼¼Êõ×°±¸Ö®Ò»£¬¶øϵ²´×Ô¶¯¶¨Î»ÏµÍ³ÊǺ£Ñ󹤳Ì×°±¸²»¿ÉȱÉٵĹؼüÉ豸£¬¶ÔÆäÑо¿²»½ö¾ßÓÐÉîÔ¶µÄÉç»áÒâÒ壬¸ü¾ß¾­¼Ã·¢Õ¹µÄÏÖʵÒâÒå¡£
º£Ñóƽ̨µÄ¶¨Î»·½Ê½ËæÉî¶È¿É·ÖΪ×ÔÉýʽ¹Ì¶¨Æ½Ì¨¡¢°ëDZʽê²´¶¨Î»Æ½Ì¨ºÍÉîË®¶¯Á¦¶¨Î»Æ½Ì¨£¬±¾ÎÄÑо¿µÄÊÇ°ëDZʽº£Ñóƽ̨ê²´¶¨Î»¿ØÖÆϵͳ¡£±¾ÎÄÊ×ÏȽéÉÜÁ˺£Ñóƽ̨¶¨Î»ÏµÍ³Ñо¿µÄ±³¾°ºÍº£Ñóƽ̨µÄ·ÖÀ࣬·ÖÎöÁ˺£Ñóƽ̨µÄ·¢Õ¹ÏÖ×´ºÍƽ̨µÄ½á¹¹£¬²ûÊÍÁËδÀ´°ëDZʽº£Ñóƽ̨µÄ·¢Õ¹Ç÷ÊÆ£¬Ìá³öÁËê²´¶¨Î»¿ØÖƵķ½·¨£»¼´ÓÉÖÐÑë¼ÆËã»ú¿ØÖÆ°Ę̈»ùÓÚPLC¿ØÖƵÄϵ²´½Ê³µ£¬Í¨¹ý·çÀ˼ì²â¡¢²¨ÀËÔ¤±¨£¬Ð­µ÷°Ę̈ϵ²´½Ê³µÒÔËٶȿØÖÆ¡¢Í¬²½¿ØÖƺͺãÕÅÁ¦¿ØÖƵIJ»Í¬ÔËÐÐģʽ£¬ÊµÏÖº£Ñó×÷ҵƽ̨µÄ¶¨Î»ºÍϵ²´°²È«¡£
ÎÄÖжԺ£Ñóƽ̨µÄϵ²´·½Ê½ºÍ¸ÖÀÂϵ²´ÐÎʽ½øÐÐÁË·ÖÎö£¬½¨Á¢ÁË°ëDZʽº£Ñóƽ̨һ½×ÕóÐ͵ÄÊýѧģÐÍ£¬¶Ôϵ²´¸ÖÀµÄÊÜÁ¦½øÐÐÁ˼ÆËãºÍ·ÖÎö£¬¸ø³öÁ˺£Ñóƽ̨½âñî¼ÆËãµÄ·½·¨ºÍʵʱԤ±¨µÄ¼ÆËã·½·¨¡£Ìá³öÁËҺѹϵͳÇý¶¯·½°¸ºÍ¸üÊÊÓÚϵ²´½Ê³µµÄËٶȿØÖÆ£¨»òͬ²½¿ØÖÆ£©ÓëºãÕÅÁ¦¿ØÖƵĿØÖÆËã·¨£¨Î±Î¢·Ö£¨PDF£©·´À¡¿ØÖÆ£©£»Í¬Ê±Õë¶ÔÔÚ¹¤³Ìʵ¼ùÖУ¬ÓÉÓÚÍâ½çµÄ¸ÉÈźͿØÖÆÆ÷Êä³öµÄÏÞÖÆ£¬²ÉÓÃÁË¿¹»ý·Ö±¥ºÍ½â¾öʵ¼Êϵ²´½Ê³µÔËÐйý³ÌÖпÉÄ@@öÏÖµÄÎÊÌâ¡£ÎÄÖл¹¸ø³öÁËҺѹԭÀíͼ£¬·ÖÎöÁËÆ乤×÷Ô­Àí£¬²¢½éÉÜÁËÂí´ïͬ²½¿ØÖÆÀíÂÛ£¬½¨Á¢ÁË·§¿ØÂí´ï´«µÝº¯Êý¡£
×îºó½éÉÜÁ˺£Ñóƽ̨¶¨Î»ÏµÍ³½Ê³µËٶȿØÖÆ¡¢Í¬²½¿ØÖÆ¡¢ºãÕÅÁ¦¿ØÖƵÄÄ£ÄâÊÔÑéƽ̨µÄ´î½¨£¬±àдÁËÂú×ãÊÔÑéÒªÇóµÄϵͳÈí¼þ¡£¾­¹ý·ÂÕæÈí¼þµÄ·ÂÕæÈÏÖ¤ºÍÄ£ÄâÊÔÑéƽ̨µÄÄ£ÄâʵÑ飬֤Ã÷ÀíÂÛ·ÖÎöÕýÈ·£¬¿ØÖÆ·½·¨µÃµ±£¬´ïµ½ÁËÂÛÎÄÑо¿µÄÄ¿µÄºÍÒªÇó¡£
¹Ø¼ü´Ê£ºÏµ²´½Ê³µ£»ÒºÑ¹ÏµÍ³£»Í¬²½¿ØÖÆ£»ºãÕÅÁ¦¿ØÖÆ£»Î±Î¢·Ö¿ØÖÆËã·¨£»
ʵÑéϵͳ



ABSTRACT
¡¡¡¡¡¡The thesis mainly researches into the mooring positioning winch of the semi-submersible offshore platform in different working conditions of speed control, synchronous control and constant tension control, the achievement of the hydraulic system with switching function among different running modes, also the design of the control system and pilot system.
¡¡¡¡¡¡Firstly, after referring to a large number of documents in recent years both home and abroad, I have a comprehensive understanding of marine platform positioning system, such as the platform¡¢mechanism and its developing trend. These are the bases of my innovation research. To apply the matrix analytical method of multi-body system, I get the one-order mathematical model of offshore platform. Cable deformation is analyzed by applying differential and integral principals. At last I put forward decoupling calculation method of the offshore platform dynamic power and its real-time forecasting method.
Secondly, with comparison of the hydraulic system driving scheme, I study on the load-sensitive technology of mooring winch, speed control, synchronous control, constant tension control, them-related fuel lines connecting and switching mode, load-balanced loop, brake loop, two constant tension motors¡¯ oil-supplying connections, the calculation of figure of the constant tension and the setting method, the synchronous control between drum motor and cable-rowed lead screw and the cable-charged or cable-laid principal of mooring winch and its testing scheme.
Thirdly, in fact, in the control system, by taking account of both the power constraint of final-end control unit and the special response characteristics of step signal, we deduce the parameters of PDF controller of first-order and second-order system. With the comparison of PI controller with PDF controller to first-order system and the comparison PID controller with PDF controller to second-order system, we know the advantages of PDF control. It also introduces a method to solve saturated control in practical objects¡ªanti-saturated integral.
Finally, it analyses the theory of synchronous control of hydraulic motor, deduces the transfer function of valve-controlled motors. A series of simulations show the stability of synchronization control of hydraulic motor system. The thesis analyzes the reason for the error of motor in the process of running¡¢the solutions and its measures.
¡¡¡¡Keyword: Mooring Winch; Hydraulic System; Synchronous Control ; Constant Tension Control; Pseudo-Derivative-Feedback control (PDF); Experimental system

Ŀ¼
Õª Òª I
ABSTRACT III
µÚ1Õ ¸ÅÂÛ 1
1.1 Ñо¿±³¾° 1
1.2 º£Ñóƽ̨µÄ·ÖÀàÓëÑо¿ÏÖ×´ 2
1.2.1 º£Ñóƽ̨µÄ·ÖÀà 2
1.2.2 º£Ñóƽ̨Ñо¿ÏÖ×´ 3
1.3 °ëDZʽº£Ñóƽ̨µÄ¹¹³ÉÓë·¢Õ¹Ç÷ÊÆ 4
1.3.1 °ëDZʽº£Ñóƽ̨µÄ¹¹³É 4
1.3.2 °ëDZʽº£Ñóƽ̨µÄ·¢Õ¹Ç÷ÊÆ[4] 4
1.4 ÂÛÎÄÑ¡ÌâÒâÒå¼°Ñо¿ÄÚÈÝ 5
1.4.1 ±¾ÂÛÎÄÑ¡ÌâÒâÒå 5
1.4.2 ±¾ÂÛÎÄÖ÷ÒªÑо¿ÄÚÈÝ 5
1.5 ±¾ÕÂС½á 6
µÚ2Õ º£Ñóƽ̨µÄÊýѧģÐÍ 7
2.1 ϵ²´·½Ê½ 7
2.1.1 ϵ²´ÏµÍ³²¼ÖÃÐÎʽ 7
2.1.2 ¸ÖÀÂϵ²´ÐÎʽ 7
2.2 º£Ñóƽ̨ÊýѧģÐÍ 8
2.3 ¸ÖÀÂÊÜÁ¦·ÖÎö 9
2.4 ϵ²´Ïµľ²Á¦·ÖÎö 11
2.4.1 ê²´Ïßƽºâ·½³Ì 11
2.4.2 ϵͳ»Ø¸´Á¦ 12
2.5 ½âñî¼ÆËãÓëʵʱԤ±¨ 13
2...