110kv终端无人值班变电站设计.rar
110kv终端无人值班变电站设计,110kv终端无人值班变电站设计1.5万字 42页摘 要本设计是将xx市旧城区110v变电站改造设计为无人值班变电站。根据原始资料,进行电气主接线设计,通过多个方案比较选择性价比较高的方案。根据用户负荷情况确定主变压器;通过两点典型的短路点进行短路电流计算来确定各一次设备的选型。主要内容包括:电气主接线设计;主变压器的...
该文档为压缩文件,包含的文件列表如下:
内容介绍
原文档由会员 200306 发布
110kV终端无人值班变电站设计
1.5万字 42页
摘 要
本设计是将xx市旧城区110V变电站改造设计为无人值班变电站。根据原始资料,进行电气主接线设计,通过多个方案比较选择性价比较高的方案。根据用户负荷情况确定主变压器;通过两点典型的短路点进行短路电流计算来确定各一次设备的选型。主要内容包括:电气主接线设计;主变压器的确定;站用电源变压器的确定;短路电流计算;导体和电器的选择设计;综合自动化系统选型;保护选型;电气二次设备配置方案;信号回路;控制回路。
This design is to transform the 110V substation in the old area of xx into an unattended substation. According to the original data we decide the main electrical connection, choose the better one through several plan after we have compared their performance/cost ratio; According to the customers’ load we decide the transformer capacity; choose the types of the primary equipments after we have calculated the short circuit current of the typical two-point earth . The main contents are include: main electrical connection, selection of the main transformer, selection of the station transformer, calculation of the short circuit, selection of the conductor and electrical equipments, selection of the synthesis automation system, selection of the protection, configureation plan of the electrical secondary equipments, signal circuit, control circuit.
目 录
前言 5
设计任务书 6
设计说明书
第一章 电气主接线设计 8
第二章 主变压器的确定 11
第三章 站用电源 13
第四章 短路电流计算 14
第五章 导体和电器的选择设计 17
5-1 各级断路器和隔离开关的选择 17
5-2 10kV断路器和隔离开关的选择和校验 18
5-3 各级互感器的选择 19
5-4 各级电压母线的选择 21
5-5 一次设备型号参数一览表 22
第六章 综合自动化系统选型 26
第七章 保护选型 35
7-1 主变保护 35
7-2 10 kV馈线保护 36
7-3 电容器保护 37
7-4 接地变保护 38
7-5 站用变保护 38
7-6 二次设备型号参数一览表 38
第八章 电气二次设备配置方案 40
第九章 信号回路 41
第十章 控制回路 41
附录 42
参考资料 42
参考资料:
⑴. 湖南省电机工程学会: 《无人值班变电站的新建、改造与运行》 中国电力出版社。
⑵. 徐腊元、高以梅: 《农村电网值班变电站设计与技术应用》中国电力出版社。
1.5万字 42页
摘 要
本设计是将xx市旧城区110V变电站改造设计为无人值班变电站。根据原始资料,进行电气主接线设计,通过多个方案比较选择性价比较高的方案。根据用户负荷情况确定主变压器;通过两点典型的短路点进行短路电流计算来确定各一次设备的选型。主要内容包括:电气主接线设计;主变压器的确定;站用电源变压器的确定;短路电流计算;导体和电器的选择设计;综合自动化系统选型;保护选型;电气二次设备配置方案;信号回路;控制回路。
This design is to transform the 110V substation in the old area of xx into an unattended substation. According to the original data we decide the main electrical connection, choose the better one through several plan after we have compared their performance/cost ratio; According to the customers’ load we decide the transformer capacity; choose the types of the primary equipments after we have calculated the short circuit current of the typical two-point earth . The main contents are include: main electrical connection, selection of the main transformer, selection of the station transformer, calculation of the short circuit, selection of the conductor and electrical equipments, selection of the synthesis automation system, selection of the protection, configureation plan of the electrical secondary equipments, signal circuit, control circuit.
目 录
前言 5
设计任务书 6
设计说明书
第一章 电气主接线设计 8
第二章 主变压器的确定 11
第三章 站用电源 13
第四章 短路电流计算 14
第五章 导体和电器的选择设计 17
5-1 各级断路器和隔离开关的选择 17
5-2 10kV断路器和隔离开关的选择和校验 18
5-3 各级互感器的选择 19
5-4 各级电压母线的选择 21
5-5 一次设备型号参数一览表 22
第六章 综合自动化系统选型 26
第七章 保护选型 35
7-1 主变保护 35
7-2 10 kV馈线保护 36
7-3 电容器保护 37
7-4 接地变保护 38
7-5 站用变保护 38
7-6 二次设备型号参数一览表 38
第八章 电气二次设备配置方案 40
第九章 信号回路 41
第十章 控制回路 41
附录 42
参考资料 42
参考资料:
⑴. 湖南省电机工程学会: 《无人值班变电站的新建、改造与运行》 中国电力出版社。
⑵. 徐腊元、高以梅: 《农村电网值班变电站设计与技术应用》中国电力出版社。