强夯施工组织方案.doc

约17页DOC格式手机打开展开

强夯施工组织方案,1、工程概况·················································12、方案编制依据·············································13、强夯设计技术要求········································...
编号:6-531958大小:106.50K
分类: 其它

内容介绍

此文档由会员 wuguilinentao 发布

1、工程概况·················································1
2、方案编制依据·············································1
3、强夯设计技术要求·········································2
4、强夯施工前准备工作·······································2
5、试夯施工·················································3
6强夯施工方法··············································6
7质量检查控制点············································7
8质量预控措施··············································8
9安全、环保和文明措施······································10
10夯工程雨季施工方案······································11
11强夯工程雨季施工方案·····································13
12人力与施工机具设备······································14
13施工进度计划·············································15
附:夯点布置图
强夯平面位置都